Point-to-Point Link for TC Energy’s Remote Temporary Camp

RSG Telecom collaborated with TC Energy to complete a critical telecommunication project involving the commissioning of a 115-kilometer point-to-point link to deliver high-speed connectivity to a remote temporary camp for construction services. The project required innovative engineering and design solutions, including multiple hops and colocations on existing towers, to ensure reliable and accelerated broadband access for the site.

Scope of Work

  1. Point-to-Point Link: RSG Telecom engineered and deployed a point-to-point link spanning 115 kilometers to connect TC Energy’s remote temporary camp to the nearest network infrastructure hub, delivering a reliable 300Mbps connection to support construction services.
  2. Design and Engineering: The team designed and engineered six hops along the point-to-point link, optimizing signal transmission and reception to overcome geographical and environmental challenges while maintaining signal integrity and bandwidth capacity.
  3. Co-locations on Existing Towers: RSG Telecom strategically leveraged existing tower infrastructure along the route to collocate equipment, reducing deployment costs and accelerating project timelines while ensuring seamless integration with the existing network.
  4. Solar-Powered Repeater: To extend the reach of the point-to-point link, RSG Telecom deployed a solar-powered repeater at a remote location, providing additional signal amplification and ensuring uninterrupted connectivity across the entire link.
  5. Network Operations Center (NOC) Monitoring: RSG Telecom’s NOC continuously monitored the point-to-point link to proactively identify and address any potential issues or disruptions, ensuring optimal performance and reliability for TC Energy’s construction services.

Key Achievements

  1. Accelerated Broadband Access: RSG Telecom’s innovative engineering and design solutions provided TC Energy’s remote temporary camp with accelerated broadband access, enabling seamless communication and data transfer for their construction services.
  2. Cost-Effective Deployment: By leveraging existing tower infrastructure and deploying a solar-powered repeater, RSG Telecom optimized deployment costs and minimized environmental impact while ensuring robust connectivity for the remote site.
  3. Reliability and Performance: The engineered point-to-point link demonstrated robust reliability and performance, meeting TC Energy’s bandwidth requirements and supporting construction operations without interruptions or downtime.
  4. Proactive Network Monitoring: RSG Telecom’s NOC monitoring services ensured proactive identification and resolution of network issues, minimizing disruptions and downtime to maintain seamless communication for TC Energy’s construction services.

Conclusion

RSG Telecom’s successful completion of the point-to-point link project for TC Energy’s remote temporary camp exemplifies our commitment to delivering innovative, reliable, and cost-effective solutions for critical infrastructure projects. By leveraging our expertise in engineering, design, deployment, and network monitoring, we have empowered TC Energy with accelerated broadband access and seamless connectivity to support construction services in remote environments.